BackgroundProgramme of workObjectivesTarget OutputsProgressDissemination eventsRepair ConfigurationsProject Partners• DocumentsContacts

Project Documents

This page can be used to download project documents, including:

The project documents can be downloaded by clicking on the document featured below.

Documents in other formats (such as word templates and graphics) can also be downloaded.

Approximate file sizes are indicated for downloadable pdf and zip files.

General Documents  
Partner Contact Details
PDF
Report Style Guide
PDF
LICONS Logo (graphic file)
LICONS Report Front Cover Template (word document)
Mid-term Report  
LICONS - Combined 12 month progress and mid-term report
PDF
Appendix 1 - Task Bar Chart
PDF
Appendix 2 - Case Study Report Task 9.2 - LegnoDOC
PDF
Appendix 3 - Report Task 2.1- LegnoDOC
PDF
Appendix 4 - Report Task 8.5 - LRBB
PDF
Appendix 5 - Report Task 5.3 - TRADA
PDF
Appendix 6 - Estimating for Timber Resin Repairs
PDF
Appendix 7 - Task Bar Chart - revised
PDF
Appendix 8 - Minutes of meetings in Oxford, Bordeaux and S…
PDF
Appendix 9 - Report Task 2-2 - OBU
PDF
Appendix 10 - Report Task 5.3 - LegnoDOC
PDF
Appendix 11 - Proposal Task 4.2 - LNEC.
PDF
Appendix 12 - Report Task 5.1 - LNEC
PDF
Appendix 13 - Task 2 example - Rotafix
PDF
Appendix 14 - Report Task 2-2-b - OBU
PDF
Appendix 15 - Report Task 4 - OBU
PDF
Appendix 16 - Report Task 2 - LRBB
PDF
Appendix 17 - Report Task 4 - LRBB
PDF
Appendix 18 - Outline of Report Task 6 - STAP
PDF
Interim Reports
Task 2.1 (LegnoDoc, 3/03)
PDF
Task 2.2 (OBU, 3/03)
PDF
Task 5.3 (LegnoDoc, 3/03)
PDF
Duration of Load Effects (LRBB, 3/03)
PDF
Thermal Analysis (LNEC, 3/03)
PDF
Site Visit Report - Brighton, UK (by M. Fort)
PDF
Development of Eurocode-type design rules for axially loaded bonded-in rods (TRADA 9/03)
PDF
Task 2.2 - Review of Relevant Materials and Their Requirements for Timber Repair and restoration (OBU 10/03)
PDF
Specimen Dimensions and Test Configurations (LRBB)
PDF
Task 7 Procedures for making prefabricated elements. (First Annual Report)
PDF
Task 10 Documentation and development of websites. (First Annual Report)
PDF
Task 1.2 First Annual Report (TRADA)
PDF
Task 3.1 First Annual Report (TRADA)
PDF
Task 7 Progress Report (Legnodoc)
PDF
Task 4.1 Preliminary Test Series (OBU)
PDF
Task 9.2 Real Life CAse Study Trials (Legnodoc)
PDF
Task 10 Updated Website Structure Map (TRADA)
ZIP
Task 6 Development of Specifications and Quality Tools : Updated Report March 2004 (STAP)
PDF
LICONS Final Technical Support Summary Task 4 - OBU
PDF
Information Resources
Draft EC5:Part 2 Annex C - Bonded-in Rods
PDF
Draft Adhesive Performance Classification (From TRADA Project 285)
PDF
3 and 4 Point Bending and Shear Test Beams
PDF
Extract From GIROD Project Report: WP7 - Test Methods For Production Control
PDF
Influence of Glue Rheology and Joint Thickness on the Strength of Bonded-in Rods (Technical Paper)
PDF
Pictorial Resources
Old Timber Structures in Lisbon and Garum Museum
ZIP
Licons dissemination & Association with WG6, WG11, COST34
LICONS - dissemination events to July 05
PDF
Task 6 - Licons Manual
PDF
N20 (Quality Assurance)
PDF
N21 (Quality Assurance)
PDF
N22 (Quality Assurance)
PDF
Principal Repair Methods
PDF
Repair of Cracks and Fissures
PDF
Beam upgrade
PDF
Aydon Castle
PDF
GWESPA
PDF
John Makin House
PDF
St albans George Street
PDF
zootique
PDF
Meeting Agendas
Agenda From Meeting 2 - LRBB, Bordeaux, 11/4/03
PDF
Agenda From Meeting 3 - Siena, Italy, 10/10/03
PDF
Itinerary For Meeting 3 - Siena, Italy, 10/10/03
PDF
Agenda From Meeting 4 - LNEC, Lisbon, Portugal, 02/04/04
PDF
Meeting Minutes
Minutes From Meeting 1 - Oxford Brookes University, 31/5/02
PDF
Minutes From Meeting 2 - LRBB, Bordeaux, 11/4/03
PDF
Siena, Italy, 10/10/03    
Annex78-bendingoftrialjoints - Helena Cruz
Bending of trial joints - Helena Cruz
Connolly & Mettem Axial Resistance BIRs
Draft fire
Minutes of LICONS Meeting in Siena on 10-10-03
report - Siena - Maria Empis, STAP
Task2-2-b - James Broughton
Task 2 - D G Smedley
TensileTests - Helena Cruz
LNEC 02-04-04
Test Samples - strain gauge positions 280504
Task 9.2 - Case Study Report - ColleVald'ElsaWorkshop - LegnoDoc - final draft
Task 6 - Draft of Manual - STAP 29-3-04
Task 4.1 Preliminarytesting-finalversion - James Broughton
Progress report-task7- Paolo Lavisci
Progress report Portuga lMarch2004 - Helena Cruz
Minutes of Meeting at LNEC 2-4-04
LICONS - Test Configurations - 29 March 2004
LICONS - Task 6 presentation - STAP
LICONS - PRELIMINARY TESTS - Roy Jones
Final Meeting Minutes
Appendix 1 - Bond repair of cracked beams - Helena Cruz
PDF
Appendix 1.1 - Bond repair of cracked beams - Powerpoint Presentation - Helena Cruz
PDF
Appendix 2 - Effect of Temperature - Helena Cruz+Joao Custodio
PDF
Appendix 3 - Task 2 - Gwespa Report - Dave Smedley
PDF
Appendix 4 - Task 2 - Zootique Report - Dave Smedley
PDF
Appendix 5 - Task 2 - Report by Paolo Lavisci
PDF
Appendix 5.1 - Task 2 - Report by Paolo Lavisci
Appendix 6 - Task 5 report - Vincent Gardelle
PDF
Appendix 7 - Task 5 - Powerpoint Presentation - Vincent Gardelle
PDF
Appendix 8 - Task 5 - test results - Helena Cruz
PDF
Appendix 8.1 - Annexes to test report - Helena Cruz
PDF
Appendix 9 - Task 6 - Operator Manual - Raquel Paula
PDF
Appendix 10 - Task 6 - Operator Manual - Powerpoint Presentation - Raquel Paula
PDF
Appendix 11 - Task 7 Report - Paolo Lavisci
PDF
Appendix 12 - Lisbon farmhouse photos - Raquel Paula
PDF
Appendix 13 - Task 9 - Lucca Report - Paolo Lavisci
PDF
Appendix 14 - Italian Standard UNI 11138-2004 - Paolo Lavisci
PDF
Appendix 15 - Translation of UNI 11138-2004 - Paolo Lavisci
PDF
Appendix 16 - Task 10 Report - Paolo Lavisci
PDF
Minutes of Meeting in Paris on 20 May 2005
PDF
Final UK Meeting at OBU    
Minutes of Final UK Meeting at OBU on 19-7-05

 

Any advice or methodology provided by LICONS contributors, reseracher or commercial member and/or any of its associated employees and agents is given in good faith but without warranty insofar as interpretation and use by a third party is beyond our control.