| General
Documents |
|
|
| Partner
Contact Details |
|
|
| Report Style
Guide |
|
|
| LICONS Logo
(graphic file) |
|
|
| LICONS Report
Front Cover Template (word document) |
|
|
| Mid-term
Report |
|
|
| LICONS - Combined
12 month progress and mid-term report |
|
|
| Appendix 1
- Task Bar Chart |
|
|
| Appendix 2
- Case Study Report Task 9.2 - LegnoDOC |
|
|
| Appendix 3
- Report Task 2.1- LegnoDOC |
|
|
| Appendix 4
- Report Task 8.5 - LRBB |
|
|
| Appendix 5
- Report Task 5.3 - TRADA |
|
|
| Appendix 6
- Estimating for Timber Resin Repairs |
|
|
| Appendix 7
- Task Bar Chart - revised |
|
|
| Appendix 8
- Minutes of meetings in Oxford, Bordeaux and S… |
|
|
| Appendix 9
- Report Task 2-2 - OBU |
|
|
| Appendix 10
- Report Task 5.3 - LegnoDOC |
|
|
| Appendix 11
- Proposal Task 4.2 - LNEC. |
|
|
| Appendix 12
- Report Task 5.1 - LNEC |
|
|
| Appendix 13
- Task 2 example - Rotafix |
|
|
| Appendix 14
- Report Task 2-2-b - OBU |
|
|
| Appendix 15
- Report Task 4 - OBU |
|
|
| Appendix 16
- Report Task 2 - LRBB |
|
|
| Appendix 17
- Report Task 4 - LRBB |
|
|
| Appendix 18
- Outline of Report Task 6 - STAP |
|
|
| Interim
Reports |
|
|
| Task 2.1 (LegnoDoc,
3/03) |
|
|
| Task 2.2 (OBU,
3/03) |
|
|
| Task 5.3 (LegnoDoc,
3/03) |
|
|
| Duration of
Load Effects (LRBB, 3/03) |
|
|
| Thermal Analysis
(LNEC, 3/03) |
|
|
| Site Visit
Report - Brighton, UK (by M. Fort) |
|
|
| Development
of Eurocode-type design rules for axially loaded bonded-in rods (TRADA
9/03) |
|
|
| Task 2.2 -
Review of Relevant Materials and Their Requirements for Timber Repair
and restoration (OBU 10/03) |
|
|
| Specimen Dimensions
and Test Configurations (LRBB) |
|
|
| Task 7 Procedures
for making prefabricated elements. (First Annual Report) |
|
|
| Task 10 Documentation
and development of websites. (First Annual Report) |
|
|
| Task 1.2
First Annual Report (TRADA) |
|
|
| Task 3.1 First
Annual Report (TRADA) |
|
|
| Task 7 Progress
Report (Legnodoc) |
|
|
| Task 4.1 Preliminary
Test Series (OBU) |
|
|
| Task 9.2 Real
Life CAse Study Trials (Legnodoc) |
|
|
| Task 10 Updated
Website Structure Map (TRADA) |
|
|
| Task 6 Development
of Specifications and Quality Tools : Updated Report March 2004 (STAP)
|
|
|
| LICONS Final Technical Support Summary Task 4 - OBU |
|
|
| Information
Resources |
|
|
| Draft EC5:Part
2 Annex C - Bonded-in Rods |
|
|
| Draft Adhesive
Performance Classification (From TRADA Project 285) |
|
|
| 3 and 4 Point
Bending and Shear Test Beams |
|
|
| Extract From
GIROD Project Report: WP7 - Test Methods For Production Control |
|
|
| Influence
of Glue Rheology and Joint Thickness on the Strength of Bonded-in Rods
(Technical Paper) |
|
|
Pictorial
Resources
|
|
|
| Old Timber
Structures in Lisbon and Garum Museum |
|
|
| Licons
dissemination & Association with WG6, WG11, COST34
|
| LICONS - dissemination
events to July 05 |
|
|
| Task 6 - Licons
Manual |
|
|
| N20 (Quality
Assurance) |
|
|
| N21 (Quality
Assurance) |
|
|
| N22 (Quality
Assurance) |
|
|
| Principal
Repair Methods |
|
|
| Repair of
Cracks and Fissures |
|
|
| Beam upgrade |
|
|
| Aydon Castle |
|
|
| GWESPA |
|
|
| John Makin
House |
|
|
| St albans
George Street |
|
|
| zootique |
|
|
| Meeting
Agendas |
|
|
| Agenda From
Meeting 2 - LRBB, Bordeaux, 11/4/03 |
|
|
| Agenda From
Meeting 3 - Siena, Italy, 10/10/03 |
|
|
| Itinerary
For Meeting 3 - Siena, Italy, 10/10/03 |
|
|
| Agenda From
Meeting 4 - LNEC, Lisbon, Portugal, 02/04/04 |
|
|
| Meeting
Minutes |
|
|
| Minutes From
Meeting 1 - Oxford Brookes University, 31/5/02 |
|
|
| Minutes From
Meeting 2 - LRBB, Bordeaux, 11/4/03 |
|
|
| Siena, Italy,
10/10/03 |
|
|
| Annex78-bendingoftrialjoints
- Helena Cruz |
|
|
| Bending of
trial joints - Helena Cruz |
|
|
| Connolly &
Mettem Axial Resistance BIRs |
|
|
| Draft fire |
|
|
| Minutes of
LICONS Meeting in Siena on 10-10-03 |
|
|
| report - Siena
- Maria Empis, STAP |
|
|
| Task2-2-b
- James Broughton |
|
|
| Task 2 - D
G Smedley |
|
|
| TensileTests
- Helena Cruz |
|
|
| LNEC 02-04-04 |
|
|
| Test Samples
- strain gauge positions 280504 |
|
|
| Task 9.2 -
Case Study Report - ColleVald'ElsaWorkshop - LegnoDoc - final draft |
|
|
| Task 6 - Draft
of Manual - STAP 29-3-04 |
|
|
| Task 4.1 Preliminarytesting-finalversion
- James Broughton |
|
|
| Progress report-task7-
Paolo Lavisci |
|
|
| Progress report
Portuga lMarch2004 - Helena Cruz |
|
|
| Minutes of
Meeting at LNEC 2-4-04 |
|
|
| LICONS - Test
Configurations - 29 March 2004 |
|
|
| LICONS - Task
6 presentation - STAP |
|
|
| LICONS - PRELIMINARY
TESTS - Roy Jones |
|
|
| Final Meeting
Minutes |
|
|
| Appendix 1
- Bond repair of cracked beams - Helena Cruz |
|
|
| Appendix 1.1
- Bond repair of cracked beams - Powerpoint Presentation - Helena Cruz |
|
|
| Appendix 2
- Effect of Temperature - Helena Cruz+Joao Custodio |
|
|
| Appendix 3
- Task 2 - Gwespa Report - Dave Smedley |
|
|
| Appendix 4
- Task 2 - Zootique Report - Dave Smedley |
|
|
| Appendix 5
- Task 2 - Report by Paolo Lavisci |
|
|
| Appendix 5.1
- Task 2 - Report by Paolo Lavisci |
|
|
| Appendix 6
- Task 5 report - Vincent Gardelle |
|
|
| Appendix 7
- Task 5 - Powerpoint Presentation - Vincent Gardelle |
|
|
| Appendix 8
- Task 5 - test results - Helena Cruz |
|
|
| Appendix 8.1
- Annexes to test report - Helena Cruz |
|
|
| Appendix 9
- Task 6 - Operator Manual - Raquel Paula |
|
|
| Appendix 10
- Task 6 - Operator Manual - Powerpoint Presentation - Raquel Paula |
|
|
| Appendix 11
- Task 7 Report - Paolo Lavisci |
|
|
| Appendix 12
- Lisbon farmhouse photos - Raquel Paula |
|
|
| Appendix 13
- Task 9 - Lucca Report - Paolo Lavisci |
|
|
| Appendix 14
- Italian Standard UNI 11138-2004 - Paolo Lavisci |
|
|
| Appendix 15
- Translation of UNI 11138-2004 - Paolo Lavisci |
|
|
| Appendix 16
- Task 10 Report - Paolo Lavisci |
|
|
| Minutes of
Meeting in Paris on 20 May 2005 |
|
|
| Final UK Meeting
at OBU |
|
|
| Minutes of
Final UK Meeting at OBU on 19-7-05 |
|
|
Any advice or methodology provided by LICONS contributors,
reseracher or commercial member and/or any of its associated employees
and agents is given in good faith but without warranty insofar as interpretation
and use by a third party is beyond our control. |